Industrial Block

Karaganda / 62,000 m² / 2024—2026

Delivered
Industrial Block
NF-014 / 100% / Design demonstration: company, projects, documents and figures are fictional.

A production facility handed over after integrated systems testing. Work zones, logistics and service routes support a continuous operating cycle.

Construction phases

100% / COMPLETE
Complete

Commissioning

2025 / 07—09

Integrated tests, as-built documents and handover to the operating team.

Control point

✓ Handover package assembled

Construction record / demo

JAN / Site preparation and flow organization
JAN / 2024Site preparation and flow organization
FEB / Acceptance of structural elements
FEB / 2024Acceptance of structural elements
MAR / Assembly and section coordination
MAR / 2024Assembly and section coordination
APR / Envelope closure and facade works
APR / 2024Envelope closure and facade works
MAY / Engineering systems and zone acceptance
MAY / 2024Engineering systems and zone acceptance
Project ledger
AREA62,000 m²
STEEL3,600 t
CONCRETE24,100 m³
TEAM212
DURATION24 months