Pavlodar / 84,000 m² / 2026—2029

Planning
Infrastructure 04
NF-032 / 12% / Design demonstration: company, projects, documents and figures are fictional.

A transport section and drainage network planned as one territorial system. The first package covers site preparation, temporary roads and material-flow organization.

Construction phases

12% / COMPLETE
Current phase

Site

2026 / 01—03

Access, temporary roads and work zones organized before the main works begin.

Control point

Site organization accepted

Construction record / demo

JAN / Site preparation and flow organization
JAN / 2026Site preparation and flow organization
FEB / Acceptance of structural elements
FEB / 2026Acceptance of structural elements
MAR / Assembly and section coordination
MAR / 2026Assembly and section coordination
APR / Envelope closure and facade works
APR / 2026Envelope closure and facade works
MAY / Engineering systems and zone acceptance
MAY / 2026Engineering systems and zone acceptance
Project ledger
AREA84,000 m²
STEEL1,800 t
CONCRETE32,000 m³
TEAM96
DURATION32 months