NF-032
Infrastructure 04
Pavlodar / 84,000 m² / 2026—2029
Planning
A transport section and drainage network planned as one territorial system. The first package covers site preparation, temporary roads and material-flow organization.
Construction phases
12% / COMPLETECurrent phase
Site
2026 / 01—03Access, temporary roads and work zones organized before the main works begin.
Control point
Site organization accepted
Construction record / demo





AREA84,000 m²
STEEL1,800 t
CONCRETE32,000 m³
TEAM96
DURATION32 months